1. Home
  2. Electric Systems
  3. Pitagora 4.0
  4. Pitagora 4.0 – Installing the controller

Pitagora 4.0 – Installing the controller


Controller in the machine room




5) Caution: perform all wirings and connections before hanging the cabinet to the back plate.


MRL “All-In-One” controller

MRL “Star” controller


4) The bottom panel must be reassembled only after connecting the floor control panel with the power unit controller.



Updated on 9 Maggio 2025
Was this article helpful?

Related Articles

dido.dmg.it
Learn more

Cookies Policy